Quality & supply
Review the selected model, sample and supporting documents before ordering.
Model, sample and delivery checks
Confirm fit using the actual strip, conductor or equipment. Request the documents and packing details for the selected model.
Request a quote- Model and fit
- Record the ordering code and dimensions. Confirm strip width and pins, conductor range or PCB pitch as applicable.
- Sample approval
- Test the actual assembly and retain the approved specification for repeat orders.
- Documents
- CE, TÜV and UL documents apply to selected WIRIX models. Confirm the covered model, issuer, standard and destination-market requirement.
- Packing and delivery
- Confirm pack quantity, carton size, net/gross weight, delivery term and destination with the quotation.
Supply arrangements
MOQ, customization, availability and lead time are confirmed by model and quantity. Selected in-stock items may be prepared in as fast as five working days after specification confirmation. Freight, DDP options for selected markets and related electrical sourcing can be discussed with Rico.
Detailed purchasing checklist
| Buyer question | Reference to confirm | When to lock it |
|---|---|---|
| Is this the exact configuration? | Ordering code, product image, drawing or catalog family and key dimensions | Before sampling |
| Does it fit the intended strip, wire or board? | Strip width and pin count; conductor range; pitch and positions; cable diameter | During selection and sample review |
| Are the electrical values appropriate? | Voltage, current, conductor range and other model-specific ratings | Before quotation approval |
| Does a certificate or declaration apply? | For selected WIRIX items: CE, TUV or UL document; verify the holder or issuer, exact model or covered family, standard and market requirement | Before order release |
| Can freight and landed cost be planned? | Pack quantity, carton dimensions, net weight, gross weight, quantity and delivery term | Before shipment planning |
| Can the same item be reordered? | Approved sample, final specification, packing reference and change record | At first-order approval |
Inside our factory
Our own factories support LED connector and ignition wire production. This video shows production, inspection and packing at our LED connector factory.
Our company